View Full Version : Graphic application
earntaz
11-09-2016, 01:11 AM
I will be painting my Nova with PPG urethane 2 stage CC/CC system. How long should I let the paint "dry" before applying the graphic decals? Thanks ... TAZ
bluel78
11-09-2016, 11:26 AM
In the collision industry we put graphics on the same day using fast drying clear. I never seen a decal bubble but I have seen a heavier moulding held on with double sided tape come loose after the solvents evaporated. With that said, I would wait three months, the same amount of time before we tell customers to wait before applying a silicon based wax. Dustin
I agree,no sooner than 3-6 mos.,if not longer.
vBulletin® v3.8.11, Copyright ©2000-2025, vBulletin Solutions Inc.