Unreal
07-07-2002, 07:58 PM
I know that early 69 Z/28's had a 6000/7000 tach, mid production had a 6000/8000 tach, and that very late production had a 6500/8000 tach.
Why did L72 and L78 have 6000/7000 throughout the entire production year, creating the need to stock two items?
Why did L72 and L78 have 6000/7000 throughout the entire production year, creating the need to stock two items?