Re: Wanted: P.S and Alt brackets
Chuck... Since water pumps were installed at the Tonawanda plant, at the time of engine assembly, I figured either 065 or 811 would be acceptable.
The engine was assembled on 4/29, so I'm figuring up to 2-1/2 months prior to the build date would be acceptable. Feb might be a bit early, but March/April would be good. I have a couple water pumps, but none dated before the engine assemby date of this engine.
|