The way I understood it was that the Fisher date for the body was the last week of February (02D) but the VIN sequence of the car falls within an early March build. It may have been possible that the body shell was delayed during assembly @ Fisher. The block was assembled March 7th so that would have to be a very long delay in production.
Last edited by GotGrunt; 05-28-2019 at 01:38 PM.
|