Ok ,Back to the shop, where we left off was finishing the outside of the building. Next steps were to create two tracks to allow access and revamp the front landscaping. The revamp included a new walkway to the front door.
Followed by the new tracks for entry to the parking bay:
The city would not alter the front curb as there is a engineering spec for a lot our size to only have one driveway entrance, so we have to live with race ramps to mount the curb.
Base rock and cross drainage:
Let the pour begin:
Next steps were replacing the lawn with a less maintenance product River rock.
We estimated 4 yards and it took six, thats 18,000 pounds if you need to know. Hired a couple of grunts to do this.
__________________
1971 W30 convert, triple green,second owner.
1971 W30 Convert, special order Rally red, under resto.
68 Charger R/T, Bullitt Replica
68 Camaro Z28,Corvette Bronze,Houndstooth
www.vancouverclassiccars.com