The last two weeks of March had a lot of moving parts as a lot of interior work was being done:
Electrical routing
Led Lights arrived and installation began.
Floor grinding and application of epoxy.
Drainage
Test area for floor epoxy
Filling the divots
Our cladding for the back wall arrived on Mar 26 and the plan was to have start installing it that weekend. With heavy rain tha last week of March we decided we needed to install a drain. This turned out to be a full weekend project renting concrete cutting saws (we broke the first one)jack hammers and digging through clay that had not been touched in 60 years.
Drainage pipe in wrapped with cloth and taped.
Add gravel.