Progress continues on the shop albeit at a modest pace, Paul is working on buttoning up and pressure testing the labyrinth of plumbing and air lines in the bathroom & wet room before we can move on to insulation/vapor barrier then drywall during the holiday break. Electrical in almost complete in this area however light switch relocation, exhaust fan testing and provisioning for a smoke detector are still on the list. I have been chipping away at some of the framing tasks; still to do is a closet for the wet room/bathroom plumbing and elimination of a hallway door opening. With limited time available on the weekend I built an 11' bulkhead in the main front office to warehouse hallway to contain some unsightly conduit and exposed low voltage wiring prior to drywall.

Hall bulkhead framing.

Reply With Quote