Progress continues on the shop albeit at a modest pace, Paul is working on buttoning up and pressure testing the labyrinth of plumbing and air lines in the bathroom & wet room before we can move on to insulation/vapor barrier then drywall during the holiday break. Electrical in almost complete in this area however light switch relocation, exhaust fan testing and provisioning for a smoke detector are still on the list. I have been chipping away at some of the framing tasks; still to do is a closet for the wet room/bathroom plumbing and elimination of a hallway door opening. With limited time available on the weekend I built an 11' bulkhead in the main front office to warehouse hallway to contain some unsightly conduit and exposed low voltage wiring prior to drywall.
Hall bulkhead framing.