Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 12-16-2019, 07:45 PM
bergy's Avatar
bergy bergy is offline
Yenko Contributing Member
 
Join Date: Feb 2005
Location: Pennsylvania, Florida
Posts: 2,802
Thanks: 866
Thanked 1,437 Times in 392 Posts
Default

Yes - February 15th

Your block/head cast dates versus engine assembly date are fine IMO. Rough castings at Tonawanda that were placed in foundry inventory were subsequently shipped to the motor plant on a LIFO (last in - first out) basis. So, extended time frames between cast dates and assembly dates are not uncommon. This is particularly true when physical inventories were taken at the foundry - that's when the stock that was in inventory for a long time was turned over. I have no idea why head cast dates would "usually" pre-date block cast dates by a period of weeks.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 01:31 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.