Go Back   The Supercar Registry > General Discussion > Chevrolet


Reply
 
Thread Tools Display Modes
  #1  
Old 02-24-2022, 12:51 AM
Too Many Projects's Avatar
Too Many Projects Too Many Projects is online now
Yenko Contributing Member
 
Join Date: Oct 2020
Location: Town of Troy, WI
Posts: 5,066
Thanks: 2,654
Thanked 3,915 Times in 1,766 Posts
Default

Well dang, I had to come back to the frozen North. May as well work on a hot rod and get paid for it.

Next up was modifying the cargo floor to fit the wide tubs. I cut out the floor in approximately the shape of the tub and used the cut out as a filler/weld flange piece.






This is a VERY abbreviated version, as it took me 3 days to get this all to fit and look this good.







I then finished the day by cutting out a tag board template of the filler panel I will make to blend the original inner to the tub.





__________________
Mitch
1970 Chevelle SS
1966 Chevelle SS
1967 Camaro ss/rs
1938 Business coupe, street rod
2000 FXSTS, original owner, 13k miles
Reply With Quote
The Following 6 Users Say Thank You to Too Many Projects For This Useful Post:
big gear head (02-24-2022), dustinm (02-24-2022), L78_Nova (02-24-2022), Lynn (02-24-2022), olredalert (02-24-2022), Woodrock (02-24-2022)
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:54 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.