Go Back   The Supercar Registry > General Discussion > Pontiac


Reply
 
Thread Tools Display Modes
  #91  
Old 05-27-2012, 12:16 PM
Dave Rifkin Dave Rifkin is offline
Yenko Contributing Member
 
Join Date: Aug 2001
Location: Little Egg Harbor, NJ, USA
Posts: 2,208
Thanks: 13,860
Thanked 346 Times in 177 Posts
Default Re: The New Project: Part Deux!

and so it begins...........again. Can't wait to see how nice this one turns out. I am amazed at the knowledge and skills that so many people on this site possess.
Reply With Quote
  #92  
Old 05-27-2012, 06:57 PM
SS427's Avatar
SS427 SS427 is offline
Yenko Contributing Member
 
Join Date: Jul 2001
Location: Pleasant Plains, IL
Posts: 10,303
Thanks: 3,030
Thanked 4,433 Times in 1,122 Posts
Default Re: The New Project: Part Deux!

Perseverance and tenacity at their finest! Good job once again Steve.
__________________
Rick Nelson
Musclecar Restoration and Design, Inc (retired)
www.musclecarrestorationanddesign.com
https://www.youtube.com/watch?v=62r-6vgk2_8
specialized in (only real) LS6 Chevelle restorations
Reply With Quote
  #93  
Old 05-27-2012, 09:20 PM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,339
Thanks: 8
Thanked 2,678 Times in 830 Posts
Default Re: The New Project: Part Deux!

Thank you for your morale support. [img]<<GRAEMLIN_URL>>/biggthumpup.gif[/img]

Today's project was getting the heater core out. It actually went rather well. You have to remove the pass side inner fender to do it properly in order to access the lower studs and the heater hoses. Otherwise you will spend hours with extensions, lost sockets and scraped hands. It took me ten minutes to pull the inner fender and then another ten minutes to get the nuts off the studs. Once inside the car you have to pull the glove box door, glove box and the A/C ducts from one side to the other. That way the heater assembly comes out easier. In total it took about an hour to get everything out of the car. Now I have to wait for the new core to arrive....

While the heater was out I was able to see the VIN stamped in the firewall which was a reassuring thing. I then wiped the giant black seam sealer waterfall away from the area and was able to do a pencil tracing of it. Remember it is upside down and backwards since it was stamped from the engine side - so don't have a heart attack if you try this on your car and it at first doesn't match. Take your tracing and hold it up to mirror and it will magically transpose. Or you can always just flip the photo in your photo editing program.
[img]<<GRAEMLIN_URL>>/scholar.gif[/img]




Reply With Quote
  #94  
Old 05-27-2012, 09:30 PM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,339
Thanks: 8
Thanked 2,678 Times in 830 Posts
Default Re: The New Project: Part Deux!

After the heater core removal was accomplished I crawled back under the car and started scrubbing some more with the diesel fuel and a rag. That took the rest of the day.

Here's a shot of one of the sway bar mounting brackets. Looks like a junior high school shop project on &quot;Learn How To Weld Day.&quot; They acually tried so many times that they burned through the rail under the bracket.



Reply With Quote
  #95  
Old 05-27-2012, 09:36 PM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,339
Thanks: 8
Thanked 2,678 Times in 830 Posts
Default Re: The New Project: Part Deux!

And here is the final result. After these photos were taken I snaked the old exhaust back over the axles and reattached it so at least I can drive the thing again. I will probably be getting the Gardner Exhaust for this car like I did with the 72 T/A. I'll have to wait til after the frame repairs get done, though. Though they go together very easily, that is one system that you want to install once and not take apart again. (looks too pretty to risk scratching it up).

You can see the original black overspray nicely, in these shots...and the spots I missed under the fuel/brake lines. I'll wait til its time for the frame repairs to remove those lines and clean underneath.








Reply With Quote
  #96  
Old 05-27-2012, 09:42 PM
SS427's Avatar
SS427 SS427 is offline
Yenko Contributing Member
 
Join Date: Jul 2001
Location: Pleasant Plains, IL
Posts: 10,303
Thanks: 3,030
Thanked 4,433 Times in 1,122 Posts
Default Re: The New Project: Part Deux!

<div class="ubbcode-block"><div class="ubbcode-header">Originally Posted By: njsteve</div><div class="ubbcode-body">........Gardner Exhaust for this car like I did with the 72 T/A. I'll have to wait til after the frame repairs get done, though. </div></div>

Might want to order it now as the last few times I have ordered a system they are about 6-8 weeks out. Not an issue with me as I have the time to wait but you might not.
__________________
Rick Nelson
Musclecar Restoration and Design, Inc (retired)
www.musclecarrestorationanddesign.com
https://www.youtube.com/watch?v=62r-6vgk2_8
specialized in (only real) LS6 Chevelle restorations
Reply With Quote
  #97  
Old 05-27-2012, 09:42 PM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,339
Thanks: 8
Thanked 2,678 Times in 830 Posts
Default Re: The New Project: Part Deux!

And the final item of the day was adjusting the clutch, which was grabbing way too high. On a hunch, I pulled the actuating rod and noticed the same wear that was on my other car. This groove was cut halfway through, eventually it would have snapped off. I will be replacing both rods: the bellcrank to fork rod, as well as the pedal to bellcrank rod as they both tend to exhibit the same wear patterns.


Reply With Quote
  #98  
Old 05-27-2012, 09:43 PM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,339
Thanks: 8
Thanked 2,678 Times in 830 Posts
Default Re: The New Project: Part Deux!

<div class="ubbcode-block"><div class="ubbcode-header">Originally Posted By: SS427</div><div class="ubbcode-body"><div class="ubbcode-block"><div class="ubbcode-header">Originally Posted By: njsteve</div><div class="ubbcode-body">........Gardner Exhaust for this car like I did with the 72 T/A. I'll have to wait til after the frame repairs get done, though. </div></div>

Might want to order it now as the last few times I have ordered a system they are about 6-8 weeks out. Not an issue with me as I have the time to wait but you might not. </div></div>

Good point. Makes for a great Father's Day gift. I will start dropping hints now. [img]<<GRAEMLIN_URL>>/grin.gif[/img]
Reply With Quote
  #99  
Old 05-28-2012, 02:16 AM
old5.0 old5.0 is offline
Senior Member
 
Join Date: Feb 2008
Posts: 921
Thanks: 1
Thanked 4 Times in 4 Posts
Default Re: The New Project: Part Deux!

I wonder if this one'll get to a million views? [img]<<GRAEMLIN_URL>>/naughty.gif[/img]
Reply With Quote
  #100  
Old 05-31-2012, 01:42 AM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,339
Thanks: 8
Thanked 2,678 Times in 830 Posts
Default Re: The New Project: Part Deux!

I got the new heater core installed and the box is back in the dash again. I can never understand how something can drop out so easily but take so much finagling and manhandling to get the darn thing back into the car. It took over an hour to figure out the exact angle and turns to get the heater box back under the dashboard. [img]<<GRAEMLIN_URL>>/no.gif[/img]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 10:36 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.