![]() Dedicated to the Promotion and Preservation of American Muscle Cars, Dealer built Supercars and COPO cars. |
#21
|
||||
|
||||
![]()
at 16:39 you can see a Motion Super Car club key fob!
__________________
69 Camaro RS/SS X22 4speed NOM but working on something special 69 Camaro x11 355 crossram m22 12 bolt 3.73's |
#22
|
|||
|
|||
![]()
the body tag info puts the chevelle build in early mar as mentioned for the engine. the 02D build week bleeds into March 69 likely for the first week or so based on where the info falls in my list. i doubt it was held up in production. the vin is likely in the 3554XX-3555XX range. very neat.
__________________
Andy Team Chevelle #3135 ACES #08305 1969 Chevelle Trim Tag Research (On-going) |
The Following 2 Users Say Thank You to SS69chevelle For This Useful Post: | ||
69 Post Sedan (05-27-2019), the427king (06-02-2019) |
#23
|
|||
|
|||
![]()
I don't know anything about this particular car and whether it has its born with engine or not. But ---
The trim tag date is based on when the vehicle order was input into the system at the assembly plant, aka the "broadcast date". Actual construction of the car started after that. More importantly, the week coding was NOT the way many folks think it was (with the first 7 days of any month being week "A" and so forth, which was not the case). If that were true then there would not be so many tags out there that have "E" week designations. As far as I know no one really knows when one "week" ended and the next one started, or how it was handled when the month changed in the middle of the work week, which would happen almost every month anyway. For example, I have an unrestored Baltimore 67 SS with trim tag date 11E. The broadcast cards that were in the seats have "broadcast date" of December 1, 1966. So even though this car's order was not even entered into the system at the plant until December, it has a November tag date. Another example is the earliest known legitimate factory 67 L78 Chevelle, which has trim tag date 04C and engine date (verified on the original [real] POP) of T0425EG. But the VIN places it as leaving the plant on the last production day in April (car is 172 units from the last car built in April at that plant, so was a "last day" of April car). So, as I said I don't know about this car, but with February only having 28 days, it is easily conceivable that an 02D trim tag dated car did not actually get built until early March.
__________________
Jeff Helms 65 Z16 Survivor 65 Z16 drag car 66 Chevelle L78 unrestored 67 Chevelle L78 unrestored 67 Camaro SS350 Survivor |
The Following User Says Thank You to jeffschevelle For This Useful Post: | ||
L78M22Rag (06-02-2019) |
#24
|
||||
|
||||
![]()
That is an assumption on your part that I believe is incorrect. I have data on a number of Camaros that were actually built the week prior to the build date on the tag. Also, the body numbers were in the same range as cars that were built a week later. Example, a car is built at the end of one month when taking the VIN into account (and NCRS report backs up car was built during last week of the month) but the trim tag and body number are for the first week of the following month. You can't input a vehicle order into the system at the plant a week after the car has already been built.
|
![]() |
Thread Tools | |
Display Modes | |
|
|