Go Back   The Supercar Registry > General Discussion > Lounge


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 12-12-2019, 12:56 AM
cheveslakr cheveslakr is offline
Yenko Contributing Member
 
Join Date: Oct 2010
Posts: 499
Thanks: 1,103
Thanked 325 Times in 143 Posts
Default

HA! that's a bit better than Karps. They took 4 months on mine. It takes a lot for me to rip on someone, but when a company tells you 3 times over 3 months that it'll be done that very week, we have an issue. I sent my last resleeve to LoneStar brakes and they performed as I expected. They'll get my next one.
Rebuilding a master is a simple gig, but you need to source the best seals you can. Dealing with 2 stroke bikes will teach you this in a hurry.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:55 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.