Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


Reply
 
Thread Tools Display Modes
  #1  
Old 11-28-2017, 10:48 PM
RAII4speed RAII4speed is online now
Senior Member
 
Join Date: Aug 2014
Location: MA
Posts: 187
Thanks: 87
Thanked 6 Times in 6 Posts
Default 04D 1969 Calendar

My car was built the 4th week of April 1969
What dates are considered the 4th week of April?
Attached Images
 
__________________
I don't hate the rich, And I don't pitty the poor
Reply With Quote
  #2  
Old 11-29-2017, 12:03 AM
fsc66 fsc66 is offline
Yenko Paid Member
 
Join Date: Nov 2013
Location: Long Island, NY
Posts: 499
Thanks: 11
Thanked 47 Times in 28 Posts
Default What week

20th through the 26th

Paul
__________________
paul@winvoices.com
Reply With Quote
  #3  
Old 11-29-2017, 12:07 AM
SS69chevelle SS69chevelle is offline
Yenko Paid Member
 
Join Date: Apr 2006
Location: NC
Posts: 160
Thanks: 1
Thanked 0 Times in 0 Posts
Default

my research has revealed no relation to actual calendar weeks. just when you think you have it another week messes everything up. if you now the gm transfer date (NCRS Doc) you ca get an idea of when the car was assembled in a particular month. several of the month bleed into the following month in my 1969 chevelle lists. good luck, Andy
__________________
Andy
Team Chevelle #3135
ACES #08305
1969 Chevelle Trim Tag Research (On-going)
Reply With Quote
  #4  
Old 11-30-2017, 09:28 PM
JayR JayR is offline
Member
 
Join Date: Jul 2003
Location: Abbotsford B.C. Canada
Posts: 86
Thanks: 3
Thanked 1 Time in 1 Post
Default

Does anyone know exactly how the body build weeks were determined? Because there are both D and E months, I'm thinking they probably used a calendar much like we use in the broadcast industry for advertising billing and program scheduling purposes? The standard broadcast calendar is 12 months of equal Monday thru Sunday weeks. In order to make that happen, there have to be some 5 week months every year. I believe March/69 would have been a 3E month. In April/69, the first Monday would be March 31 and the month would end on Sunday, April 27 making April a 4D month. The first week of May/69 (5A) would begin on Monday, April 28. May/69 was also a 5D month. Thoughts and comments appreciated.

Bob
__________________
The Canadian L79 Registry

Last edited by JayR; 11-30-2017 at 10:48 PM.
Reply With Quote
  #5  
Old 11-30-2017, 09:34 PM
BigD69 BigD69 is offline
Yenko Paid Member
 
Join Date: Feb 2017
Location: Ohio
Posts: 60
Thanks: 9
Thanked 6 Times in 4 Posts
Default

I had a Z10 that was 05E trim tag date.
Reply With Quote
  #6  
Old 12-04-2017, 12:03 PM
ZLP955 ZLP955 is offline
Yenko Paid Member
 
Join Date: Dec 2012
Location: Australia
Posts: 545
Thanks: 46
Thanked 31 Times in 20 Posts
Default

My LOS Camaro has an 04A tag, and NCRS shipper records show the production date of 4/3/69.
__________________
Tim
1969 Van Nuys 04A Z/28 69-69 715 ex-E/MP
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:40 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2018, vBulletin Solutions Inc.